SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #12  
Old 07-19-2009, 05:37 PM
allene allene is offline
Senior Member
 
Join Date: Feb 2008
Posts: 191
Default

I tried out the system today and it really didn't work that well. When doing a gybe with the 3:1 configuration, all the lines got tangled up and it was basically a mess. The 6:1 was nice though. I am thinking of abandoning this setup and trying something different. Basically, taking one line to the gooseneck and then back through a block to a cleat on the cabin top or to a free winch. I have two free winches on the cabin top. One end aft and one forward. It would take two crew to do a fast gybe but at least all the lines would not get tangled. Also, this would allow the mainsheet trimmer to sit on the rail and trim from there at the aft of the cabin top. There would still be the option to trim from the stern using the swivel block cam cleat when crushing, or from a winch on the cabin top for that matter. I need to work out the blocks so it is fair.

Allen
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 07:13 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.