SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #1  
Old 07-13-2008, 01:30 AM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Gear

Hi Brian,
We either owned the gear, or bought it for the job. That winch is a Hobbs Lowering Device, designed for arborists. It has been a fabulous, hardworking tool.
As for the ship's future, it appears to be extremely short; we were hired for the downrig because major pieces were starting to fall out of the sky, and the hull was in even worse shape. So we are endeavoring to give the dear vessel a solid and respectful last downrig. As of today, after 3 weeks here, there are only 3 topmasts and some standing rigging left to send down. Already on deck are the jibboom, 4 t'gallant masts,14 yards, and thousands of feet of standing rigging. Also a huge pile of blocks, shackles, etc. We calculate that we have lowered about 40 tons of wood and metal so far. This is a large ship.
Fair leads,
Brion Toss
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 12:23 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.