SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #22  
Old 11-29-2015, 05:54 PM
Kim Klaka Kim Klaka is offline
Junior Member
 
Join Date: Dec 2011
Location: Fremantle, Australia
Posts: 3
Default cause of spectra backstay failure?

Hi,
Fascinating article by Evans on Spectra lifelines, thanks.
I think we are more or less agreed on the need to protect spectra from sunlight in extreme climates, and that quality control of splices requires comparable standards, and has similar implications, to the required QC on wire swages.
We shall just have to agree to disagree for now, about whether the load I applied to the backstay was excessive. Seeing as nobody else has posted on this thread recently I'll close. If I get the opportunity to take some load measurements I may revisit the discussion.
In the meantime thanks for a very enlightening and thought-provoking thread. As with most research, questions lead to more questions!
Kim
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 07:16 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.